Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
408
matching recommendationsNAICS | 31142 | Fruit and Vegetable Canning, Pickling, and Drying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0582 # 09 Y:2022 | 09 | 2022 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $3,070 | $11,782 | Implemented |
SF0582 # 03 Y:2022 | 03 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $29,881 | $2,290 | Implemented |
SF0582 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,960 | $0 | Implemented |
SF0582 # 02 Y:2022 | 02 | 2022 | MODIFY STARTUP/SHUTDOWN TIMES | $7,144 | $0 | Implemented |
SF0582 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,836 | $41,117 | Implemented |
SF0582 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,257 | $45,587 | Implemented |
SF0582 # 04 Y:2022 | 04 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $10,294 | $2,290 | Implemented |
SF0582 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,094 | $17,764 | Implemented |
AS0505 # 01 Y:2021 | 01 | 2021 | USE LESS WASTEFUL PACKAGING | $178,199 | $183,215 | Implemented |
AS0505 # 05 Y:2021 | 05 | 2021 | KEEP EQUIPMENT CLEAN | $4,063 | $464 | Implemented |
UU0179 # 02 Y:2021 | 02 | 2021 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $27,935 | $2,000 | Implemented |
UU0179 # 05 Y:2021 | 05 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,131 | $100 | Implemented |
UU0179 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,013 | $6,614 | Implemented |
SF0549 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,204 | $25,635 | Implemented |
SF0549 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,719 | $0 | Implemented |
SF0549 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $475 | $1,214 | Implemented |
SF0549 # 08 Y:2020 | 08 | 2020 | USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING | $22,925 | $1,810 | Implemented |
SF0549 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $403 | $1,776 | Implemented |
UD1010 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,598 | $500 | Implemented |
UD1010 # 05 Y:2020 | 05 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,001 | $60,000 | Implemented |
UD1010 # 06 Y:2020 | 06 | 2020 | REPAIR OR REPLACE STEAM TRAPS | $483 | $5,500 | Implemented |
UD1010 # 10 Y:2020 | 10 | 2020 | REDESIGN PROCESS | $3,722 | $43,500 | Implemented |
UD1010 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $299 | $0 | Implemented |
LS1915 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,228 | $1,974 | Implemented |
LE0476 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $96,090 | $12,000 | Implemented |