IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

116

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0009 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $28,059 $10,000 Implemented
DL0009 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,192 $50,000 Implemented
DL0009 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,890 $695 Implemented
DL0009 # 09 Y:2007 09 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,924 $3,809 Implemented
DL0009 # 11 Y:2007 11 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,550 $20,000 Implemented
DL0009 # 13 Y:2007 13 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $302 $10,000 Implemented
UM0332 # 04 Y:2007 04 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $26,141 $12,385 Implemented
UM0332 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,954 $638 Implemented
UM0332 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $45,783 $500 Implemented
UM0332 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $56,464 $1,000 Implemented
UD0767 # 01 Y:2007 01 2007 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $30,284 $1,500 Implemented
UD0767 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,625 $2,175 Implemented
LE0264 # 10 Y:2007 10 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,288 $1,000 Implemented
LE0264 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,184 $2,500 Implemented
LE0264 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,084 $500 Implemented
LE0264 # 03 Y:2007 03 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,204 $2,000 Implemented
LE0264 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,103 $2,500 Implemented
LE0264 # 01 Y:2007 01 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,680 $50,000 Implemented
BD0331 # 04 Y:2007 04 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $11,450 $4,951 Implemented
SF0348 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,324 $16,819 Implemented
SF0348 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $205 $1,020 Implemented
SF0348 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $865 $2,974 Implemented
SF0348 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $811 $0 Implemented
UM0324 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,978 $0 Implemented
UM0324 # 05 Y:2007 05 2007 OPTIMIZE PLANT POWER FACTOR $7,222 $6,917 Implemented