IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 3274 Lime and Gypsum Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0838 # 02 Y:2022 02 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,878 $6,206 Implemented
MA0838 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,385 $65,000 Implemented
MA0838 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,687 $6,969 Implemented
MA0838 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,706 $250 Implemented
MA0838 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,501 $500 Implemented
AS0459 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $1,642 $3,200 Implemented
AS0459 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,314 $280 Implemented
UU0133 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $2,849 $1,155 Implemented
UU0133 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,767 $5,679 Implemented
GT0898 # 02 Y:2017 02 2017 METER WASTE WATER $38,607 $18,000 Implemented
GT0898 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,648 $9,390 Implemented
AM0713 # 05 Y:2016 05 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,460 $3,900 Implemented
AM0713 # 04 Y:2016 04 2016 USE SYNTHETIC LUBRICANT $4,600 $0 Implemented
AM0713 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,870 $16,220 Implemented
AM0713 # 02 Y:2016 02 2016 OPTIMIZE PLANT POWER FACTOR $58,650 $76,000 Implemented
AM0664 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $625 $870 Implemented
AM0664 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,970 $4,550 Implemented
AM0664 # 05 Y:2014 05 2014 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $5,260 $0 Implemented
AM0664 # 04 Y:2014 04 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $7,770 $1,200 Implemented
AM0664 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,030 $3,600 Implemented
UM0433 # 02 Y:2013 02 2013 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $19,439 $2,500 Implemented
UM0433 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $37,193 $1,000 Implemented
OR0597 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $3,853 $3,853 Implemented
OR0597 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,480 $9,480 Implemented
MA0700 # 05 Y:2012 05 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,934 $500 Implemented