IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

223

matching recommendations
Reset
NAICS 3336 Engine, Turbine, and Power Transmission Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0414 # 08 Y:2022 08 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,012 $25,709 Implemented
MI0414 # 09 Y:2022 09 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,987 $2,137 Implemented
MI0414 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $40,534 $120 Implemented
MI0414 # 03 Y:2022 03 2022 UPGRADE CONTROLS ON COMPRESSORS $35,363 $35,990 Implemented
MI0414 # 07 Y:2022 07 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,441 $2,980 Implemented
MI0414 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,496 $1,980 Implemented
MA0845 # 02 Y:2022 02 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $26,668 $60,000 Implemented
MA0845 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,754 $14,292 Implemented
WV0632 # 09 Y:2022 09 2022 DEVELOP A REPAIR/REPLACE POLICY $714 $1,638 Implemented
WV0632 # 10 Y:2022 10 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $669 $3,115 Implemented
WV0632 # 11 Y:2022 11 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $456 $1,192 Implemented
WV0632 # 02 Y:2022 02 2022 IMPROVE COMBUSTION CONTROL CAPABILITY $5,035 $3,423 Implemented
WV0632 # 08 Y:2022 08 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $727 $92 Implemented
WV0632 # 12 Y:2022 12 2022 INSTALL OCCUPANCY SENSORS $371 $1,135 Implemented
WV0632 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $1,112 $1,037 Implemented
WV0632 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,805 $706 Implemented
UC2201 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,728 $2,000 Implemented
UC2201 # 01 Y:2022 01 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,041 $56,085 Implemented
UC2201 # 09 Y:2022 09 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,563 $0 Implemented
UC2201 # 08 Y:2022 08 2022 PAY UTILITY BILLS ON TIME $530 $0 Implemented
UC2201 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,036 $48,285 Implemented
AM0851 # 04 Y:2022 04 2022 USE SYNTHETIC LUBRICANT $185 $300 Implemented
AM0851 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $277 $972 Implemented
TT0279 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $43,670 $43,750 Implemented
IC0265 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,312 $7,533 Implemented