IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0887 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $15,716 $2,500 Implemented
NC0435 # 06 Y:2011 06 2011 INSTALL TIMERS AND/OR THERMOSTATS $295 $1,500 Implemented
NC0435 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $661 $1,911 Implemented
NC0435 # 03 Y:2011 03 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $1,887 $7,760 Implemented
NC0435 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,479 $72,211 Implemented
TT0072 # 01 Y:2011 01 2011 USE OPTIMUM TEMPERATURE $16,018 $0 Implemented
TT0071 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,100 $66,100 Implemented
TT0071 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,400 $52,100 Implemented
TT0071 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,700 $5 Implemented
NC0430 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,839 $0 Implemented
NC0430 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,052 $100 Implemented
NC0430 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,314 $150 Implemented
NC0430 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,385 $4,833 Implemented
WV0425 # 04 Y:2011 04 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,251 $9,400 Implemented
WV0425 # 07 Y:2011 07 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,578 $3,004 Implemented
WV0425 # 06 Y:2011 06 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,760 $0 Implemented
MA0668 # 03 Y:2011 03 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,401 $11,610 Implemented
MA0668 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $986 $950 Implemented
MA0668 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $3,004 $3,750 Implemented
MA0668 # 02 Y:2011 02 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,899 $11,500 Implemented
MA0668 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,378 $1,800 Implemented
SU0306 # 05 Y:2011 05 2011 RECOVER AND REUSE COOLING WATER $32,137 $12,052 Implemented
SU0306 # 03 Y:2011 03 2011 RECOVER AND REUSE SPENT ACID BATHS $49,465 $4,029 Implemented
SU0306 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,901 $337 Implemented
SU0306 # 01 Y:2011 01 2011 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,413 $0 Implemented