IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 2282 Throwing And Winding Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0192 # 05 Y:2018 05 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $76,893 $19,300 Implemented
UA0192 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,273 $3,165 Implemented
UA0192 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,416 $200 Implemented
GT0867 # 02 Y:2009 02 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $8,794 $4,000 Implemented
GT0867 # 04 Y:2009 04 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,518 $6,000 Implemented
GT0867 # 06 Y:2009 06 2009 USE SYNTHETIC LUBRICANT $1,440 $0 Implemented
GT0867 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,426 $3,250 Implemented
GT0739 # 07 Y:2002 07 2002 UPGRADE CONTROLS ON COMPRESSORS $3,488 $0 Implemented
GT0739 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,592 $1,900 Implemented
GT0739 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,450 $50,177 Implemented
GT0739 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $658 $500 Implemented
GT0739 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,700 $300 Implemented
HO0161 # 05 Y:1997 05 1997 $480 $100 Implemented
HO0161 # 07 Y:1997 07 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $12,500 $2,000 Implemented
HO0161 # 03 Y:1997 03 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $723 $385 Implemented
HO0161 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,362 $11,311 Implemented
OD0067 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,202 $400 Implemented
HO0136 # 05 Y:1996 05 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,736 $6,500 Implemented
HO0136 # 04 Y:1996 04 1996 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $47,059 $145,000 Implemented
HO0136 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $211 $905 Implemented
HO0136 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $96 $200 Implemented
ME0112 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,580 $27,400 Implemented
ME0112 # 01 Y:1993 01 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $745 $100 Implemented
TN0449 # 05 Y:1992 05 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,588 $1,805 Implemented
TN0449 # 03 Y:1992 03 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,635 $5,425 Implemented