Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
120
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0090 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $280 | $120 | Implemented |
OR0471 # 11 Y:2004 | 11 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,291 | $27,750 | Implemented |
OR0471 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,840 | $4,840 | Implemented |
OR0471 # 02 Y:2004 | 02 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $22,560 | $8,500 | Implemented |
OR0471 # 03 Y:2004 | 03 | 2004 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $4,600 | $7,100 | Implemented |
OR0471 # 04 Y:2004 | 04 | 2004 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $58,650 | $10,000 | Implemented |
OR0471 # 09 Y:2004 | 09 | 2004 | $6,000 | $1,000 | Implemented | |
MS0262 # 09 Y:2004 | 09 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $815 | $444 | Implemented |
MS0262 # 07 Y:2004 | 07 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $918 | $2,125 | Implemented |
MS0262 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,889 | $406 | Implemented |
MS0262 # 02 Y:2004 | 02 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $15,412 | $1,518 | Implemented |
MS0262 # 03 Y:2004 | 03 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,422 | $20,370 | Implemented |
MI0070 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21,868 | $2,300 | Implemented |
MI0070 # 02 Y:2004 | 02 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $197,433 | $74,805 | Implemented |
MI0070 # 04 Y:2004 | 04 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $11,397 | $5,248 | Implemented |
MA0565 # 01 Y:2004 | 01 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $216,000 | $125,000 | Implemented |
MA0565 # 02 Y:2004 | 02 | 2004 | $57,540 | $40,000 | Implemented | |
MA0565 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $2,705 | $754 | Implemented |
MA0565 # 06 Y:2004 | 06 | 2004 | INSULATE FEEDWATER TANK | $873 | $300 | Implemented |
MA0565 # 04 Y:2004 | 04 | 2004 | REPLACE BOILER | $2,760 | $750 | Implemented |
OR0468 # 04 Y:2004 | 04 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $22,000 | $1,200 | Implemented |
OR0468 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,200 | $9,200 | Implemented |
OR0468 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,700 | $13,800 | Implemented |
OR0468 # 07 Y:2004 | 07 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,200 | $27,800 | Implemented |
OR0468 # 09 Y:2004 | 09 | 2004 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $14,800 | $15,700 | Implemented |