IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0027 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $326 $1,000 Implemented
NL0027 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,840 $74,980 Implemented
NL0027 # 01 Y:2018 01 2018 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $24,797 $32,620 Implemented
TT0212 # 04 Y:2018 04 2018 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $38,635 $13,000 Implemented
TT0212 # 05 Y:2018 05 2018 METER WASTE WATER $34,128 $1,900 Implemented
TT0212 # 09 Y:2018 09 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $3,775 $5,000 Implemented
TT0212 # 11 Y:2018 11 2018 INSTALL OCCUPANCY SENSORS $283 $250 Implemented
TT0212 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $68,776 $32,000 Implemented
NC0622 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,414 $525 Implemented
NC0622 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,812 $46,617 Implemented
NC0622 # 09 Y:2018 09 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,903 $500 Implemented
NC0622 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $481 $250 Implemented
WM0127 # 05 Y:2018 05 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,828 $0 Implemented
WM0127 # 10 Y:2018 10 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $600 $1,511 Implemented
WM0127 # 09 Y:2018 09 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,110 $0 Implemented
SU0470 # 10 Y:2018 10 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $622 $907 Implemented
SU0470 # 08 Y:2018 08 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $436 $478 Implemented
OK0996 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,265 $25,906 Implemented
OK0994 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,575 $29,950 Implemented
OK0994 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,051 $590 Implemented
OK0994 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,833 $8,422 Implemented
OK0995 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,644 $404 Implemented
OK0995 # 06 Y:2018 06 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $444 $300 Implemented
OK0995 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,425 $19,203 Implemented
NL0024 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,239 $33,526 Implemented