Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0485 # 07 Y:1997 | 07 | 1997 | METER WASTE WATER | $230 | $100 | Implemented |
KU0485 # 06 Y:1997 | 06 | 1997 | RECOVER AND REUSE COOLING WATER | $1,080 | $1,180 | Implemented |
KU0485 # 03 Y:1997 | 03 | 1997 | INSULATE BARE EQUIPMENT | $470 | $300 | Implemented |
KU0485 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $560 | $660 | Implemented |
KU0485 # 01 Y:1997 | 01 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,310 | $190 | Implemented |
UF0186 # 04 Y:1997 | 04 | 1997 | USE OPTIMUM THICKNESS INSULATION | $15,189 | $35,749 | Implemented |
UF0186 # 02 Y:1997 | 02 | 1997 | INSTALL OCCUPANCY SENSORS | $2,264 | $1,984 | Implemented |
UF0186 # 06 Y:1997 | 06 | 1997 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $2,700 | $5,800 | Implemented |
UF0186 # 03 Y:1997 | 03 | 1997 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $313 | $133 | Implemented |
NV0085 # 05 Y:1997 | 05 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,705 | $2,850 | Implemented |
NV0085 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $464 | $200 | Implemented |
NV0085 # 11 Y:1997 | 11 | 1997 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $1,000 | $150 | Implemented |
NV0085 # 12 Y:1997 | 12 | 1997 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $338 | $147 | Implemented |
NV0085 # 08 Y:1997 | 08 | 1997 | INSULATE BARE EQUIPMENT | $127 | $159 | Implemented |
NV0085 # 09 Y:1997 | 09 | 1997 | COVER OPEN TANKS | $937 | $188 | Implemented |
NV0085 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $219 | $196 | Implemented |
NV0085 # 04 Y:1997 | 04 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $701 | $400 | Implemented |
CO0393 # 08 Y:1997 | 08 | 1997 | $113,220 | $25,000 | Implemented | |
CO0393 # 07 Y:1997 | 07 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $400 | $0 | Implemented |
CO0393 # 06 Y:1997 | 06 | 1997 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $9,120 | $10,000 | Implemented |
CO0393 # 05 Y:1997 | 05 | 1997 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $201,090 | $3,970 | Implemented |
CO0393 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $358 | $403 | Implemented |
CO0393 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,200 | $240 | Implemented |
CO0393 # 01 Y:1997 | 01 | 1997 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,000 | $1,170 | Implemented |
CO0392 # 02 Y:1997 | 02 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $960 | $0 | Implemented |