IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0032 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,535 $3,000 Implemented
UA0027 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,165 $1,644 Implemented
UA0025 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,844 $1,500 Implemented
UA0016 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $60,322 $10,000 Implemented
UA0013 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,315 $47,838 Implemented
UA0013 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,423 $700 Implemented
UA0013 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $17,411 $13,088 Implemented
UA0013 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,856 $0 Implemented
UA0004 # 06 Y:2007 06 2007 SHUT OFF PILOTS IN STANDBY EQUIPMENT $2,169 $230 Implemented
UA0004 # 03 Y:2007 03 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,587 $0 Implemented
GT0759 # 07 Y:2003 07 2003 USE RADIANT HEATER FOR SPOT HEATING $5,960 $2,190 Implemented
GT0759 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,765 $188,200 Implemented
GT0759 # 01 Y:2003 01 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $5,870 $3,000 Implemented
GT0759 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $89,620 $108,930 Implemented
GT0698 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,389 $250 Implemented
GT0698 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $7,360 $3,240 Implemented
GT0698 # 06 Y:2000 06 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $59,243 $300,000 Implemented
GT0698 # 07 Y:2000 07 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,235 $1,800 Implemented
GT0320 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $350 $520 Implemented
GT0318 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,650 $41,030 Implemented
GT0318 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,380 $8,000 Implemented
GT0318 # 05 Y:1987 05 1987 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,290 $1,500 Implemented
GT0318 # 06 Y:1987 06 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $940 $0 Implemented
GT0320 # 01 Y:1987 01 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $450 $300 Implemented
GT0320 # 02 Y:1987 02 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,900 $50,000 Implemented