IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,556

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0245 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45,808 $43,308 Not Implemented
UA0245 # 02 Y:2021 02 2021 USE PHOTOCELL CONTROLS $323 $197 Not Implemented
UA0245 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,374 $22,712 Not Implemented
UA0245 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,257 $1,579 Not Implemented
UA0245 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,365 $250 Not Implemented
UA0245 # 06 Y:2021 06 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $317 $450 Not Implemented
UA0244 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,477 $3,209 Implemented
UA0244 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $893 $282 Not Implemented
UA0244 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,839 $180,000 Not Implemented
UA0244 # 04 Y:2021 04 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $283,379 $2,501,328 Not Implemented
UA0244 # 05 Y:2021 05 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $117,530 $1,000 Not Implemented
UA0243 # 01 Y:2021 01 2021 INSTALL OCCUPANCY SENSORS $6,816 $22,649 Not Implemented
UA0243 # 02 Y:2021 02 2021 USE PHOTOCELL CONTROLS $8,709 $24,348 Not Implemented
UA0243 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $45,219 $10,941 Implemented
UA0243 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,058 $9,682 Implemented
UA0243 # 05 Y:2021 05 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,529 $100 Not Implemented
UA0243 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,133 $4,930 Not Implemented
TT0257 # 01 Y:2021 01 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $185,939 $360 Implemented
TT0257 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,293 $0 Implemented
TT0257 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,982 $7,100 Not Implemented
TT0257 # 04 Y:2021 04 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,957 $12,180 Not Implemented
TT0257 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,573 $3,100 Implemented
TT0255 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,816 $1,640 Implemented
TT0255 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $32,997 $1,640 Not Implemented
TT0255 # 03 Y:2021 03 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,336 $24,200 Implemented