Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
NAICS 3115 Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0459 # 01 Y:2015 01 2015 REPAIR OR REPLACE STEAM TRAPS $29,918 $5,047 Implemented
SF0459 # 14 Y:2015 14 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $42,975 $82,916 Implemented
SF0419 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,431 $16,162 Implemented
SF0419 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $637 $80 Implemented
SF0407 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $7,965 $672 Implemented
SF0407 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,152 $672 Implemented
SF0407 # 06 Y:2012 06 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,437 $1,299 Implemented
SF0404 # 10 Y:2011 10 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $676 $1,569 Implemented
SF0404 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $697 $1,356 Implemented
SF0404 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $17,934 $5,426 Implemented
SF0404 # 03 Y:2011 03 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $257 $22 Implemented
SF0404 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,243 $0 Implemented
SF0360 # 01 Y:2008 01 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $103 $0 Implemented
SF0360 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,717 $10,269 Implemented
LM0116 # 06 Y:2006 06 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $260 $0 Implemented
LM0116 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230,613 $69,350 Implemented
LM0116 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $111,472 $82,700 Implemented
SF0275 # 02 Y:2004 02 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $49,562 $39,000 Implemented
SF0275 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,238 $0 Implemented
SF0275 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,909 $3,688 Implemented
SF0269 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,653 $0 Implemented
SF0269 # 02 Y:2003 02 2003 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $635 $0 Implemented