Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0354 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,424 | $320 | Implemented |
SD0354 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,367 | $18,600 | Implemented |
SD0354 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,079 | $398 | Implemented |
SD0349 # 06 Y:2004 | 06 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $7,780 | $18,500 | Implemented |
SD0349 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,407 | $3,423 | Implemented |
SD0349 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,757 | $920 | Implemented |
SD0349 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,934 | $4,300 | Implemented |
SF0289 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,750 | $6,748 | Implemented |
SF0289 # 02 Y:2004 | 02 | 2004 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $956 | $180 | Implemented |
LM0081 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,857 | $300 | Implemented |
SF0289 # 06 Y:2004 | 06 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $270 | $885 | Implemented |
SF0289 # 01 Y:2004 | 01 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,527 | $2,527 | Implemented |
SD0344 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,104 | $440 | Implemented |
SD0344 # 05 Y:2004 | 05 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,399 | $18,500 | Implemented |
SD0344 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,981 | $35,875 | Implemented |
LM0074 # 10 Y:2004 | 10 | 2004 | $41,860 | $19,000 | Implemented | |
LM0074 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $3,094 | $231 | Implemented |
LM0074 # 02 Y:2004 | 02 | 2004 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,288 | $1,000 | Implemented |
LM0074 # 03 Y:2004 | 03 | 2004 | $392 | $0 | Implemented | |
LM0074 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,673 | $125 | Implemented |
LM0074 # 05 Y:2004 | 05 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $3,618 | $4,000 | Implemented |
LM0074 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,439 | $1,740 | Implemented |
LM0074 # 08 Y:2004 | 08 | 2004 | $21,938 | $6,600 | Implemented | |
SD0334 # 07 Y:2004 | 07 | 2004 | USE EVAPORATION TO CONCENTRATE MATERIAL | $641 | $380 | Implemented |
SD0334 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,279 | $390 | Implemented |