IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

564

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0537 # 07 Y:2003 07 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,030 $120 Not Implemented
CO0537 # 08 Y:2003 08 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,540 $500 Implemented
CO0522 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $184 $308 Not Implemented
CO0522 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $414 Not Implemented
CO0522 # 04 Y:2003 04 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,870 $1,950 Not Implemented
CO0522 # 03 Y:2003 03 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,300 $840 Not Implemented
CO0522 # 02 Y:2003 02 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,420 $10,000 Not Implemented
CO0522 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,140 $10,660 Not Implemented
CO0508 # 05 Y:2002 05 2002 $115,000 $100,000 Not Implemented
CO0508 # 04 Y:2002 04 2002 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $31,960 $1,620 Implemented
CO0508 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,570 $23,500 Not Implemented
CO0508 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,230 $7,000 Implemented
CO0508 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,450 $90 Implemented
CO0505 # 03 Y:2002 03 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,940 $5,400 Implemented
CO0505 # 07 Y:2002 07 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $770 $60 Implemented
CO0505 # 06 Y:2002 06 2002 USE OPTIMUM THICKNESS INSULATION $1,260 $2,500 Not Implemented
CO0505 # 05 Y:2002 05 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $2,400 $1,680 Not Implemented
CO0505 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,800 $600 Implemented
CO0505 # 02 Y:2002 02 2002 COVER OPEN TANKS $11,730 $15,600 Not Implemented
CO0505 # 01 Y:2002 01 2002 COVER OPEN TANKS $18,110 $30,000 Not Implemented
CO0500 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $29,000 $7,000 Implemented
CO0500 # 02 Y:2002 02 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,990 $300 Implemented
CO0500 # 03 Y:2002 03 2002 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $2,640 $5,750 Not Implemented
CO0500 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $1,110 $4,890 Not Implemented
CO0500 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $730 $300 Implemented