IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0551 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,601 $850 Implemented
MA0551 # 10 Y:2004 10 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $885 $50 Implemented
MA0551 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $958 $1,020 Implemented
MA0551 # 07 Y:2004 07 2004 $2,179 $0 Implemented
MA0548 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $4,665 $1,100 Implemented
MA0521 # 01 Y:2002 01 2002 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $27,097 $34,000 Implemented
MA0521 # 02 Y:2002 02 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $16,316 $4,800 Implemented
MA0521 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,066 $7,675 Implemented
MA0521 # 04 Y:2002 04 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,717 $360 Implemented
MA0515 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,976 $0 Implemented
MA0515 # 02 Y:2002 02 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,745 $4,805 Implemented
MA0515 # 04 Y:2002 04 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $717 $0 Implemented
HO0212 # 08 Y:1999 08 1999 $11,437 $2,882 Implemented
HO0212 # 10 Y:1999 10 1999 $6,379 $500 Implemented
HO0212 # 06 Y:1999 06 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $1,548 $2,882 Implemented
HO0212 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,715 $400 Implemented
HO0204 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,583 $16,842 Implemented
HO0204 # 02 Y:1999 02 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $901 $0 Implemented
HO0204 # 06 Y:1999 06 1999 INSULATE FEEDWATER TANK $526 $438 Implemented
HO0204 # 07 Y:1999 07 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,911 $2,450 Implemented
HO0204 # 10 Y:1999 10 1999 $1,125 $318 Implemented
HO0204 # 13 Y:1999 13 1999 $2,250 $120 Implemented
HO0200 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,223 $3,065 Implemented
HO0200 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,395 $4,800 Implemented
HO0200 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,818 $7,776 Implemented