IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0353 # 02 Y:1996 02 1996 RECYCLE CLEANING SOLVENT AND REUSE $5,470 $0 Implemented
HO0123 # 01 Y:1995 01 1995 ADD AREA LIGHTING SWITCHES $2,534 $200 Implemented
HO0123 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,424 $10,340 Implemented
HO0123 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,559 $600 Implemented
MA0350 # 01 Y:1995 01 1995 INSTALL SET-BACK TIMERS $18,981 $7,000 Implemented
MA0350 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $1,806 $870 Implemented
MA0350 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,260 $500 Implemented
MA0340 # 01 Y:1995 01 1995 USE POWER DURING OFF-PEAK PERIODS $4,800 $0 Implemented
MA0340 # 02 Y:1995 02 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,349 $200 Implemented
MA0340 # 04 Y:1995 04 1995 PAY UTILITY BILLS ON TIME $1,820 $0 Implemented
MA0340 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $2,464 Implemented
MA0340 # 06 Y:1995 06 1995 REDUCE VENTILATION AIR $1,190 $3,320 Implemented
MA0340 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $753 $0 Implemented
MA0340 # 08 Y:1995 08 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $612 $330 Implemented
MA0340 # 10 Y:1995 10 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $356 $570 Implemented
MA0339 # 01 Y:1995 01 1995 BURN A LESS EXPENSIVE GRADE OF FUEL $4,128 $1,860 Implemented
MA0339 # 02 Y:1995 02 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,027 $3,770 Implemented
MA0339 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $653 $0 Implemented
MA0336 # 01 Y:1995 01 1995 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,427 $0 Implemented
MA0336 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $595 $580 Implemented
MA0336 # 04 Y:1995 04 1995 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $582 $0 Implemented
MA0336 # 05 Y:1995 05 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $461 $0 Implemented
MA0334 # 01 Y:1995 01 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,139 $0 Implemented
MA0334 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,022 $1,120 Implemented
MA0334 # 04 Y:1995 04 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,019 $2,605 Implemented