Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
241
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0598 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,338 | $432 | Implemented |
UF0598 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,433 | $14,328 | Implemented |
UF0598 # 03 Y:2023 | 03 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $30,832 | $8,310 | Implemented |
UF0598 # 08 Y:2023 | 08 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $8,114 | $0 | Implemented |
UF0598 # 09 Y:2023 | 09 | 2023 | INSTALL TURBULATORS | $6,732 | $7,500 | Implemented |
UF0598 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $61,221 | $34,460 | Implemented |
UF0598 # 10 Y:2023 | 10 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,588 | $2,800 | Implemented |
UF0598 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $10,556 | $22,000 | Implemented |
MI0404 # 03 Y:2022 | 03 | 2022 | METER WASTE WATER | $8,108 | $1,533 | Implemented |
MI0404 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $28,220 | $580 | Implemented |
MI0397 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,361 | $40 | Implemented |
MI0397 # 05 Y:2021 | 05 | 2021 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,631 | $40 | Implemented |
MI0395 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $811 | Implemented |
MI0395 # 02 Y:2021 | 02 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $14,790 | $1,380 | Implemented |
MI0395 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,523 | $1,980 | Implemented |
MI0395 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $613 | $255 | Implemented |
MI0393 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,748 | $2,211 | Implemented |
MI0393 # 02 Y:2021 | 02 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $685 | $480 | Implemented |
MI0383 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $552 | $882 | Implemented |
MI0383 # 04 Y:2020 | 04 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,698 | $1,306 | Implemented |
MI0383 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,327 | $2,436 | Implemented |
MI0383 # 03 Y:2020 | 03 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,976 | $1,428 | Implemented |
MI0383 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO HEAT WATER | $10,293 | $12,280 | Implemented |
UF0558 # 04 Y:2020 | 04 | 2020 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $1,517,489 | $143,275 | Implemented |
UF0558 # 03 Y:2020 | 03 | 2020 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $42,983 | $7,127 | Implemented |