IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

218

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0059 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,345 $3,616 Implemented
IP0057 # 02 Y:2016 02 2016 PAY BILLS ON TIME TO AVOID LATE FEES $560 $0 Implemented
IP0057 # 04 Y:2016 04 2016 COVER OPEN TANKS $3,767 $0 Implemented
IP0057 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,020 $115 Implemented
IP0057 # 09 Y:2016 09 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $927 $200 Implemented
IP0057 # 10 Y:2016 10 2016 $747 $260 Implemented
IP0057 # 13 Y:2016 13 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $440 Implemented
IP0057 # 16 Y:2016 16 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $190 $664 Implemented
IP0057 # 18 Y:2016 18 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $534 $2,607 Implemented
IP0052 # 01 Y:2015 01 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,077 $47 Implemented
IP0052 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $437 $9 Implemented
IP0052 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,655 $61 Implemented
IP0052 # 04 Y:2015 04 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $12,878 $902 Implemented
IP0052 # 07 Y:2015 07 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $10,505 $7,153 Implemented
IP0052 # 08 Y:2015 08 2015 APPLY FOR INVESTMENT INCENTIVES $12,926 $10,000 Implemented
IP0029 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,432 $4,014 Implemented
IP0029 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,953 $54,929 Implemented
UM0441 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,664 $2,500 Implemented
UM0441 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,450 $3,480 Implemented
IP0020 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,300 $0 Implemented
IP0020 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,216 $699 Implemented
IP0020 # 08 Y:2013 08 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $824 $176 Implemented
IP0017 # 02 Y:2013 02 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,701 $0 Implemented
IP0017 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $805 $0 Implemented
IP0017 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,167 $1,400 Implemented