IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

481

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0098 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,283 $6,200 Not Implemented
UM0268 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,159 $14,530 Not Implemented
UM0268 # 02 Y:2004 02 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $3,888 $840 Implemented
UM0266 # 01 Y:2004 01 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $11,825 $4,500 Implemented
UM0266 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,131 $7,512 Implemented
UM0266 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,042 $900 Implemented
UM0266 # 04 Y:2004 04 2004 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,182 $1,000 Not Implemented
UM0266 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,847 $2,000 Implemented
UM0266 # 06 Y:2004 06 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,400 $700 Not Implemented
UM0266 # 07 Y:2004 07 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,312 $3,500 Not Implemented
UM0266 # 08 Y:2004 08 2004 REVISE SMOKE CLEANUP FROM OPERATIONS $1,614 $500 Implemented
UM0266 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $1,195 $603 Not Implemented
UM0266 # 10 Y:2004 10 2004 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $666 $610 Implemented
UD0671 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $137,400 $100,000 Not Implemented
UD0671 # 02 Y:2003 02 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,075 $70 Implemented
UD0671 # 03 Y:2003 03 2003 ADD AREA LIGHTING SWITCHES $12,090 $15,000 Not Implemented
UD0671 # 04 Y:2003 04 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,713 $0 Not Implemented
UD0671 # 05 Y:2003 05 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,275 $0 Implemented
UD0671 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,103 $442 Not Implemented
UD0671 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $896 $270 Not Implemented
UD0671 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $249 $702 Not Implemented
UD0663 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $82,700 $234,000 Not Implemented
UD0663 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $64,670 $0 Implemented
UD0663 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $36,762 $87,200 Not Implemented
UD0663 # 04 Y:2003 04 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $36,720 $4,800 Not Implemented