IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,824

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0131 # 10 Y:2020 10 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,654 $60,600 Implemented
IC0231 # 01 Y:2020 01 2020 OPTIMIZE PLANT POWER FACTOR $15,040 $26,145 Implemented
IC0231 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,285 $6,673 Implemented
IC0231 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,211 $50,440 Implemented
IC0231 # 05 Y:2020 05 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,416 $0 Implemented
IP0130 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,064 $70 Implemented
IP0130 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,236 $208 Implemented
IP0130 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $537 $396 Implemented
IP0130 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $967 $1,966 Implemented
IC0230 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,524 $50 Implemented
IC0230 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $212,444 $108,320 Implemented
IP0129 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $213 $5 Implemented
IP0129 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,369 $210 Implemented
IP0129 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $148 $125 Implemented
IP0129 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $633 $1,137 Implemented
IC0228 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,679 $14,948 Implemented
IC0228 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $9,605 $2,359 Implemented
IP0128 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $331 $0 Implemented
IP0128 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,334 $76 Implemented
IP0128 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $2,633 $1,575 Implemented
IP0128 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,549 $36,977 Implemented
IP0127 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,511 $70 Implemented
IP0127 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,687 $2,825 Implemented
IC0221 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,226 $7,471 Implemented
IC0221 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,682 $4,200 Implemented