IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0481 # 07 Y:1997 07 1997 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $5,460 $16,500 Implemented
OK0419 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,338 $0 Implemented
OK0419 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $275 $432 Implemented
KU0418 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,422 $2,228 Implemented
KU0362 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $829 $1,327 Implemented
KU0362 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $401 $15 Implemented
KU0362 # 07 Y:1992 07 1992 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $1,247 $1,000 Implemented
KU0362 # 08 Y:1992 08 1992 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $988 $244 Implemented
KU0362 # 09 Y:1992 09 1992 REPAIR AND ELIMINATE STEAM LEAKS $869 $600 Implemented
KU0362 # 10 Y:1992 10 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $633 $502 Implemented
KU0306 # 05 Y:1990 05 1990 IMPROVE LUBRICATION PRACTICES $8,748 $0 Implemented
KU0306 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,643 $4,359 Implemented
OK0290 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,539 $1,080 Implemented
OK0290 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,517 $334 Implemented
OK0291 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $668 Implemented
OK0291 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $973 $909 Implemented
OK0291 # 04 Y:1989 04 1989 IMPROVE LUBRICATION PRACTICES $4,974 $0 Implemented
OK0291 # 07 Y:1989 07 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $844 $1,500 Implemented
OK0291 # 09 Y:1989 09 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,262 $100 Implemented
KU0280 # 02 Y:1989 02 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,382 $0 Implemented
KU0280 # 04 Y:1989 04 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $440 $100 Implemented
KU0280 # 05 Y:1989 05 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $250 $0 Implemented
KU0280 # 07 Y:1989 07 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $143 $40 Implemented
KU0218 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,063 $25,287 Implemented
KU0218 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $5,457 $2,500 Implemented