IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

192

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0472 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $9,915 $12,000 n/a
UM0465 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $3,158 $5,250 Not Implemented
UM0465 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,640 $2,000 Not Implemented
UM0465 # 03 Y:2016 03 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $485 $1,029 Not Implemented
UM0465 # 04 Y:2016 04 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,573 $0 Not Implemented
UM0465 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,361 $150 Not Implemented
UM0460 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,160 $1,100 Implemented
UM0460 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,482 $3,500 Not Implemented
UM0460 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,526 $161,000 Implemented
UM0460 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $305 $1,000 Not Implemented
UM0460 # 05 Y:2015 05 2015 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,072 $4,000 Implemented
UM0450 # 01 Y:2014 01 2014 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $58,763 $200,000 Not Implemented
UM0450 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,421 $26,000 Not Implemented
UM0450 # 03 Y:2014 03 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $23,065 $22,600 Not Implemented
UM0450 # 04 Y:2014 04 2014 REVISE SMOKE CLEANUP FROM OPERATIONS $14,049 $6,000 Not Implemented
UM0437 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $11,350 $4,000 Implemented
UM0437 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,400 $200 Not Implemented
UM0437 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,400 $10,000 Not Implemented
UM0437 # 04 Y:2013 04 2013 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $11,900 $5,000 Not Implemented
UM0437 # 05 Y:2013 05 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,000 $2,500 Not Implemented
UM0437 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,700 $5,700 Implemented
UM0437 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,430 $510 Implemented
UM0437 # 08 Y:2013 08 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,177 $4,660 Not Implemented
UM0437 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $4,800 $1,500 Not Implemented
UM0380 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $2,880 $2,484 Not Implemented