IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

121

matching recommendations
Reset
NAICS 3335 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0465 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,361 $150 Not Implemented
UM0460 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,160 $1,100 Implemented
UM0460 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,482 $3,500 Not Implemented
UM0460 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,526 $161,000 Implemented
UM0460 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $305 $1,000 Not Implemented
UM0460 # 05 Y:2015 05 2015 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,072 $4,000 Implemented
UM0437 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $11,350 $4,000 Implemented
UM0437 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,400 $200 Not Implemented
UM0437 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,400 $10,000 Not Implemented
UM0437 # 04 Y:2013 04 2013 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $11,900 $5,000 Not Implemented
UM0437 # 05 Y:2013 05 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,000 $2,500 Not Implemented
UM0437 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,700 $5,700 Implemented
UM0437 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,430 $510 Implemented
UM0437 # 08 Y:2013 08 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,177 $4,660 Not Implemented
UM0437 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $4,800 $1,500 Not Implemented
UM0371 # 01 Y:2010 01 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $70,732 $1,319,976 Implemented
UM0371 # 02 Y:2010 02 2010 OPTIMIZE PLANT POWER FACTOR $60,000 $50,000 Implemented
UM0371 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $18,676 $3,128 Implemented
UM0371 # 04 Y:2010 04 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $4,729 $10 Implemented
UM0371 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $35,268 Implemented
UM0371 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,475 $3,500 Implemented
UM0371 # 07 Y:2010 07 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,530 $300,000 Not Implemented
UM0364 # 01 Y:2010 01 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,260 $8,716 Not Implemented
UM0364 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,618 $7,917 Implemented
UM0364 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $1,498 $1,464 Not Implemented