IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0374 # 07 Y:2010 07 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $257 $93 Implemented
UM0374 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,185 $10,900 Implemented
IC0171 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,223 $99,311 Implemented
IC0171 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,545 $345 Implemented
IC0171 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $324 $1 Implemented
UM0354 # 04 Y:2009 04 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,144 $4,200 Implemented
UM0354 # 03 Y:2009 03 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,567 $9,570 Implemented
UM0354 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $983 $200 Implemented
UM0354 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,114 $500 Implemented
UM0354 # 02 Y:2009 02 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $17,778 $8,750 Implemented
UM0325 # 04 Y:2007 04 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,212 $0 Implemented
UM0325 # 06 Y:2007 06 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,729 $1,620 Implemented
UM0325 # 01 Y:2007 01 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $56,621 $14,400 Implemented
UM0324 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,978 $0 Implemented
UM0324 # 05 Y:2007 05 2007 OPTIMIZE PLANT POWER FACTOR $7,222 $6,917 Implemented
UM0317 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $9,662 $6,000 Implemented
UM0317 # 01 Y:2007 01 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $24,281 $50,000 Implemented
UM0317 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,666 $828 Implemented
UM0317 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $14,750 $1,970 Implemented
UM0264 # 01 Y:2004 01 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $47,250 $2,600 Implemented
UM0252 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,568 $3,999 Implemented
UM0252 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $47,515 $40,000 Implemented
UM0252 # 03 Y:2004 03 2004 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $9,272 $16,000 Implemented
UM0252 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,381 $400 Implemented
UM0244 # 02 Y:2003 02 2003 SIZE TRUCKS TO JOB $76,800 $54,000 Implemented