IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

374

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0224 # 09 Y:2003 09 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,650 $120 Implemented
UM0224 # 10 Y:2003 10 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $53,338 $12,600 Not Implemented
UM0224 # 11 Y:2003 11 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,270 $10,000 Not Implemented
UM0224 # 12 Y:2003 12 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,000 $2,500 Implemented
UM0220 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,258 $25,000 Not Implemented
UM0220 # 02 Y:2002 02 2002 MAINTAIN MACHINES TO REDUCE LEAKS $7,380 $1,150 Implemented
UM0220 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $973 $1,700 Implemented
UM0220 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,947 $2,064 Not Implemented
UM0220 # 05 Y:2002 05 2002 AIR CONDITION ONLY SPACE NECESSARY $4,385 $800 Not Implemented
UM0220 # 06 Y:2002 06 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,928 $2,400 Not Implemented
UM0220 # 07 Y:2002 07 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,690 $10,000 Not Implemented
UM0198 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,270 $1,200 Not Implemented
UM0198 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $3,042 $3,200 Not Implemented
UM0198 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,763 $450 Not Implemented
UM0198 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,965 $2,000 Not Implemented
UM0198 # 05 Y:2001 05 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,396 $4,550 Not Implemented
UM0198 # 06 Y:2001 06 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $166,400 $175,000 Not Implemented
UM0196 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,119 $4,832 Implemented
UM0196 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $8,645 $19,064 Implemented
UM0196 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $450 Implemented
UM0196 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,496 $2,500 Implemented
UM0196 # 05 Y:2001 05 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,344 $1,750 Not Implemented
UM0196 # 06 Y:2001 06 2001 $46,825 $45,535 Implemented
UM0146 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,736 $220 Not Implemented
UM0146 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $78 $200 Not Implemented