Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0463 # 04 Y:2015 | 04 | 2015 | CONVERT TO OXYFUEL BURNERS | $3,052,580 | $1,000,000 | Not Implemented |
UM0463 # 03 Y:2015 | 03 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,674 | $4,000 | Not Implemented |
UM0463 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $150,724 | $565,274 | Implemented |
UM0463 # 01 Y:2015 | 01 | 2015 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $1,052,850 | $1,822,453 | Not Implemented |
UM0462 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $2,455 | $4,800 | Not Implemented |
UM0462 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,224 | $1,000 | Not Implemented |
UM0462 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,638 | $4,500 | Not Implemented |
UM0462 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,500 | $8,000 | Not Implemented |
UM0462 # 01 Y:2015 | 01 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,802 | $7,405 | Not Implemented |
UM0462 # 02 Y:2015 | 02 | 2015 | HEAT WATER WITH EXHAUST HEAT | $16,361 | $20,000 | Not Implemented |
UM0461 # 02 Y:2015 | 02 | 2015 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,840 | $475 | Not Implemented |
UM0461 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,928 | $1,000 | Implemented |
UM0461 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,057 | $2,000 | Implemented |
UM0461 # 07 Y:2015 | 07 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,782 | $3,000 | Not Implemented |
UM0461 # 06 Y:2015 | 06 | 2015 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $195 | $1,000 | Not Implemented |
UM0461 # 05 Y:2015 | 05 | 2015 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $479 | $200 | Not Implemented |
UM0461 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $940 | $800 | Not Implemented |
UM0460 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $305 | $1,000 | Not Implemented |
UM0460 # 05 Y:2015 | 05 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,072 | $4,000 | Implemented |
UM0460 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,160 | $1,100 | Implemented |
UM0460 # 02 Y:2015 | 02 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,482 | $3,500 | Not Implemented |
UM0460 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,526 | $161,000 | Implemented |
UM0458 # 01 Y:2015 | 01 | 2015 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $7,036 | $0 | Implemented |
UM0457 # 01 Y:2015 | 01 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $261,975 | $300,000 | Not Implemented |
UM0457 # 02 Y:2015 | 02 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $162,816 | $1,000 | Implemented |