IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0336 # 08 Y:2002 08 2002 $72,604 $3,840 Implemented
AS0336 # 09 Y:2002 09 2002 $3,820 $2,080 Implemented
OR0423 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $518,000 $300,000 Not Implemented
OR0423 # 02 Y:2002 02 2002 $489,000 $410,000 n/a
OR0423 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $183,000 $120,860 Not Implemented
OR0423 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $35,800 $20,700 Implemented
OR0423 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $38,900 $0 Implemented
OR0423 # 06 Y:2002 06 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $279,200 $2,000,000 Not Implemented
CO0516 # 01 Y:2002 01 2002 INSTALL WIND POWERED ELECTRIC GENERATOR $616,200 $4,800,000 Not Implemented
CO0516 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $90,030 $21,080 Implemented
CO0516 # 03 Y:2002 03 2002 IMPROVE COMBUSTION CONTROL CAPABILITY $44,200 $30,000 n/a
CO0516 # 04 Y:2002 04 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,300 $38,900 Not Implemented
CO0516 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,370 $2,480 Implemented
CO0516 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $4,380 $900 Implemented
CO0515 # 01 Y:2002 01 2002 UPGRADE CONTROLS ON COMPRESSORS $167,740 $45,000 Implemented
CO0515 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $66,100 $24,160 Implemented
CO0515 # 03 Y:2002 03 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $50,000 $26,000 Implemented
CO0515 # 04 Y:2002 04 2002 $50,200 $4,800 Implemented
CO0515 # 05 Y:2002 05 2002 BURN WASTE OIL FOR HEAT $34,520 $18,000 Not Implemented
CO0515 # 06 Y:2002 06 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $241,800 $105,900 Not Implemented
CO0515 # 07 Y:2002 07 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $187,930 $102,500 Not Implemented
CO0515 # 08 Y:2002 08 2002 INSTALL WIND POWERED ELECTRIC GENERATOR $6,313,200 $48,000,000 Not Implemented
AS0326 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,817 $100 n/a
AS0326 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,641 $1,600 n/a
AS0326 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,936 $0 n/a