IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0170 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $466 $57 Implemented
SU0170 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,181 $47 Implemented
SU0170 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,229 $185 Implemented
SU0170 # 03 Y:2003 03 2003 $31,250 $1,000 Implemented
SU0169 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $168 Implemented
SU0169 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,694 $0 Implemented
SU0169 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,194 $26 Implemented
SU0169 # 02 Y:2003 02 2003 $53,040 $348 Implemented
SU0168 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,251 $0 Implemented
SU0168 # 01 Y:2003 01 2003 USE POWER DURING OFF-PEAK PERIODS $5,551 $0 Implemented
SU0168 # 03 Y:2003 03 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,295 $0 Implemented
SU0168 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,037 $227 Implemented
SU0167 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $839 $0 Implemented
SU0166 # 03 Y:2003 03 2003 $28,125 $10,016 Implemented
SU0166 # 07 Y:2003 07 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,000 $68,560 Implemented
SU0165 # 07 Y:2003 07 2003 UPGRADE CONTROLS ON COMPRESSORS $93,620 $94,691 Implemented
SU0165 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,503 $937 Implemented
SU0165 # 01 Y:2003 01 2003 $99,450 $110,400 Implemented
SU0165 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,370 $17,064 Implemented
SU0165 # 02 Y:2003 02 2003 RECOVER AND REUSE SPENT ACID BATHS $30,138 $3,234 Implemented
SU0164 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $723 $608 Implemented
SU0164 # 12 Y:2003 12 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $550 $0 Implemented
SU0164 # 02 Y:2003 02 2003 USE OPTIMUM THICKNESS INSULATION $115,419 $348,540 Implemented
SU0164 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,096 $55,580 Implemented
SU0164 # 05 Y:2003 05 2003 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $8,721 $0 Implemented