IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

119

matching recommendations
Reset
NAICS 33281 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0301 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,325 $0 Implemented
WV0326 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $6,011 $1,797 Implemented
WV0326 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,897 $14,339 Implemented
WV0326 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,386 $1,840 Implemented
WV0326 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,818 $1,000 Implemented
WV0326 # 07 Y:2005 07 2005 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $780 $1,076 Implemented
WV0326 # 08 Y:2005 08 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $652 $367 Implemented
WV0326 # 09 Y:2005 09 2005 USE SYNTHETIC LUBRICANT $577 $17 Implemented
WV0326 # 10 Y:2005 10 2005 DEVELOP A REPAIR/REPLACE POLICY $459 $54 Implemented
WV0326 # 12 Y:2005 12 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $295 $180 Implemented
WV0315 # 01 Y:2005 01 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $9,051 $901 Implemented
WV0315 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,726 $1,000 Implemented
WV0315 # 04 Y:2005 04 2005 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,658 $0 Implemented
WV0315 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,495 $2,560 Implemented
WV0315 # 08 Y:2005 08 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,438 $640 Implemented
WV0315 # 10 Y:2005 10 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,126 $20 Implemented
WV0315 # 11 Y:2005 11 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $985 $140 Implemented
WV0315 # 14 Y:2005 14 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $467 $20 Implemented
UD0707 # 02 Y:2004 02 2004 COVER OPEN TANKS $27,270 $4,326 Implemented
UD0707 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,956 $31,342 Implemented
UD0707 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $1,158 $245 Implemented
UD0697 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $36,804 $0 Implemented
UD0697 # 02 Y:2004 02 2004 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $11,330 $0 Implemented
UD0697 # 04 Y:2004 04 2004 REDUCE FLUID FLOW RATES $2,950 $0 Implemented
UD0697 # 11 Y:2004 11 2004 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $782 $0 Implemented