IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
NAICS 3335 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0427 # 05 Y:2011 05 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,786 $1,000 Implemented
WV0427 # 09 Y:2011 09 2011 MODIFY STARTUP/SHUTDOWN TIMES $3,115 $975 Implemented
WV0427 # 06 Y:2011 06 2011 SHADE WINDOWS FROM SUMMER SUN $5,176 $81,597 Implemented
WV0427 # 04 Y:2011 04 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,867 $637 Implemented
WV0409 # 09 Y:2010 09 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,292 $3,520 Implemented
WV0409 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,480 $0 Implemented
WV0409 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,490 $600 Implemented
WV0409 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $3,087 $625 Implemented
WV0409 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,475 $2,838 Implemented
UD0775 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $2,738 Implemented
UD0775 # 02 Y:2008 02 2008 INSTALL AUTOMATIC STACK DAMPER $650 $400 Implemented
UD0775 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $343 $300 Implemented
UD0775 # 08 Y:2008 08 2008 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $95 $0 Implemented
UD0775 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $82 $0 Implemented
WV0357 # 07 Y:2007 07 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,629 $1,601 Implemented
WV0357 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $4,383 $1,405 Implemented
WV0357 # 09 Y:2007 09 2007 DEVELOP A REPAIR/REPLACE POLICY $1,019 $175 Implemented
WV0357 # 10 Y:2007 10 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $656 $130 Implemented
WV0357 # 12 Y:2007 12 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $581 $125 Implemented
WV0357 # 13 Y:2007 13 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $546 $25 Implemented
WV0337 # 13 Y:2006 13 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $674 $1,280 Implemented
WV0337 # 10 Y:2006 10 2006 USE SYNTHETIC LUBRICANT $1,777 $0 Implemented
WV0337 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,981 $80 Implemented
WV0337 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,082 $590 Implemented
WV0337 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $5,170 $2,156 Implemented