IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

270

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0877 # 08 Y:2013 08 2013 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $61,182 $25,000 Implemented
UD0877 # 06 Y:2013 06 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,095 $0 Implemented
UD0877 # 02 Y:2013 02 2013 METER WASTE WATER $18,660 $1,000 Implemented
UD0877 # 01 Y:2013 01 2013 ELIMINATE THIRD SHIFT $75,782 $0 Implemented
UD0874 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,535 $0 Implemented
UD0874 # 02 Y:2013 02 2013 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $16,400 $200 Implemented
UD0866 # 11 Y:2012 11 2012 REPAIR OR REPLACE STEAM TRAPS $28,807 $0 Implemented
UD0866 # 15 Y:2012 15 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $9,098 $10,982 Implemented
UD0866 # 10 Y:2012 10 2012 USE MINIMUM STEAM OPERATING PRESSURE $83,103 $83,103 Implemented
UD0866 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,740 $0 Implemented
UD0866 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,378 $22,134 Implemented
UD0866 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,071 $41,345 Implemented
UD0839 # 13 Y:2011 13 2011 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $48,911 $75,000 Implemented
UD0839 # 12 Y:2011 12 2011 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,987 $993 Implemented
UD0839 # 11 Y:2011 11 2011 REPAIR AND ELIMINATE STEAM LEAKS $5,425 $2,100 Implemented
UD0839 # 10 Y:2011 10 2011 OPERATE BOILERS ON HIGH FIRE SETTING $11,810 $23,620 Implemented
UD0839 # 09 Y:2011 09 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,418 $3,000 Implemented
UD0839 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,472 $0 Implemented
UD0839 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $58,395 $500 Implemented
UD0839 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,985 $5,668 Implemented
UD0805 # 18 Y:2009 18 2009 ISOLATE HOT OR COLD EQUIPMENT $666 $0 Implemented
UD0805 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,327 $8,043 Implemented
UD0805 # 09 Y:2009 09 2009 REDUCE EXCESSIVE BOILER BLOWDOWN $5,312 $5,000 Implemented
UD0805 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,938 $6,703 Implemented
UD0805 # 16 Y:2009 16 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,428 $1,000 Implemented