IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

337

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0881 # 11 Y:2013 11 2013 USE MINIMUM STEAM OPERATING PRESSURE $184 $200 Implemented
UD0881 # 10 Y:2013 10 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,191 $15,000 Implemented
UD0881 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,410 $50 Implemented
UD0881 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,640 $6,800 Implemented
UD0881 # 05 Y:2013 05 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,823 $1,200 Implemented
UD0881 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,257 $0 Implemented
UD0881 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,622 $24,525 Implemented
WV0448 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,725 $9,258 Implemented
WV0448 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,979 $1,826 Implemented
WV0448 # 08 Y:2012 08 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,103 $1,000 Implemented
WV0448 # 09 Y:2012 09 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $117 $7 Implemented
WV0447 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,067 $17,569 Implemented
WV0447 # 02 Y:2012 02 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $19,009 $1,000 Implemented
WV0447 # 05 Y:2012 05 2012 DEVELOP A REPAIR/REPLACE POLICY $7,871 $1,608 Implemented
WV0447 # 10 Y:2012 10 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,330 $0 Implemented
UD0832 # 08 Y:2011 08 2011 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,424 $500 Implemented
UD0832 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $986 $500 Implemented
UD0832 # 06 Y:2011 06 2011 UPGRADE OBSOLETE EQUIPMENT $4,243 $4,728 Implemented
UD0832 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,419 $39,141 Implemented
UD0832 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,977 $1,063 Implemented
UD0832 # 02 Y:2011 02 2011 DISCONNECT BALLASTS $2,570 $250 Implemented
UD0832 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,751 $40,000 Implemented
WV0422 # 04 Y:2011 04 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,049 $2,000 Implemented
WV0422 # 03 Y:2011 03 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,167 $1,000 Implemented
WV0422 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $2,822 $1,150 Implemented