IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

273

matching recommendations
Reset
NAICS 3212 Veneer, Plywood, and Engineered Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0679 # 04 Y:2016 04 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,513 $47,575 Implemented
OR0679 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,472 $0 Implemented
OR0664 # 03 Y:2016 03 2016 INSTALL SPECTRAL REFLECTORS / DELAMP $12,507 $32,393 Implemented
OR0664 # 04 Y:2016 04 2016 UPGRADE CONVEYORS $74,609 $242,718 Not Implemented
OR0664 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $1,310 $2,584 Not Implemented
OR0664 # 01 Y:2016 01 2016 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $2,739 $0 Not Implemented
OR0658 # 01 Y:2015 01 2015 MODIFY CURRENT INCENTIVE PROGRAM $22,712 $60,000 Not Implemented
OR0658 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $680,062 $427,000 Implemented
OR0658 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $54,203 $59,203 Implemented
OR0658 # 04 Y:2015 04 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,781 $0 Not Implemented
OR0657 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $24,174 $32,596 Not Implemented
OR0657 # 03 Y:2015 03 2015 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $207,496 $694,826 Not Implemented
OR0657 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,205 $50,205 Implemented
OR0640 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,092 $12,092 Implemented
OR0640 # 03 Y:2014 03 2014 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,298 $1,020 Not Implemented
OR0640 # 04 Y:2014 04 2014 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $20,241 $67,550 Not Implemented
OR0640 # 01 Y:2014 01 2014 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $131,605 $242,261 Implemented
OR0640 # 02 Y:2014 02 2014 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,455 $0 Not Implemented
OR0639 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,461 $360 Implemented
OR0639 # 05 Y:2014 05 2014 OPTIMIZE PLANT POWER FACTOR $3,528 $15,201 Not Implemented
OR0639 # 01 Y:2014 01 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $14,677 $12,315 Implemented
OR0639 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,572 $7,500 Not Implemented
OR0639 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $7,377 $7,643 Implemented
OR0638 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,466 $8,550 Not Implemented
OR0638 # 06 Y:2014 06 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $40,207 $13,800 Not Implemented