IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0360 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,909 $0 Implemented
OR0360 # 03 Y:1999 03 1999 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $6,248 $20,000 Not Implemented
OR0360 # 05 Y:1999 05 1999 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $17,520 $2,000 Implemented
OR0360 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $18,785 $67,680 Not Implemented
OR0360 # 01 Y:1999 01 1999 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $9,585 $2,840 Implemented
OR0359 # 05 Y:1999 05 1999 COMBINE UTILITY METERS $1,851 $10,000 Not Implemented
OR0359 # 01 Y:1999 01 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $80,000 $95,000 Not Implemented
OR0359 # 02 Y:1999 02 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,013 $0 Implemented
OR0359 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,648 $9,500 Not Implemented
OR0359 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $786 $2,200 Not Implemented
OR0358 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $0 $3,600 Not Implemented
OR0358 # 02 Y:1999 02 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $2,574 $12,750 Not Implemented
OR0358 # 03 Y:1999 03 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $860 $17,000 Not Implemented
OR0358 # 04 Y:1999 04 1999 ELIMINATE A BY-PRODUCT $9,905 $2,000 Implemented
OR0357 # 02 Y:1999 02 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $91,000 $95,000 Not Implemented
OR0357 # 05 Y:1999 05 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,150 $0 Implemented
OR0357 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $1,621 $4,800 Implemented
OR0357 # 03 Y:1999 03 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $2,800 $7,000 Not Implemented
OR0357 # 01 Y:1999 01 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $423,000 $140,000 Not Implemented
OR0357 # 04 Y:1999 04 1999 UTILIZE A LESS EXPENSIVE COOLING METHOD $198,470 $500,000 Not Implemented
OR0356 # 03 Y:1999 03 1999 UPGRADE CONTROLS ON COMPRESSORS $808 $0 Implemented
OR0356 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $616 $1,800 Not Implemented
OR0356 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $103 $400 Implemented
OR0355 # 08 Y:1999 08 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,780 $2,016 Not Implemented
OR0355 # 01 Y:1999 01 1999 UPGRADE CONTROLS ON COMPRESSORS $44,724 $0 Implemented