IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

263

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0200 # 03 Y:2004 03 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,305 $800 Implemented
LE0200 # 04 Y:2004 04 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,878 $4,000 Implemented
LE0200 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,266 $750 Implemented
LE0200 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,198 $0 Implemented
LE0200 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,132 $400 Implemented
LE0200 # 08 Y:2004 08 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $904 $500 Implemented
LE0200 # 09 Y:2004 09 2004 IMPROVE COMBUSTION CONTROL CAPABILITY $857 $200 Implemented
LE0200 # 10 Y:2004 10 2004 USE OPTIMUM THICKNESS INSULATION $768 $300 Implemented
LE0200 # 11 Y:2004 11 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $657 $380 Implemented
LE0197 # 01 Y:2004 01 2004 $269,280 $300,000 Implemented
LE0197 # 02 Y:2004 02 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $55,434 $60,000 Implemented
LE0197 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $52,852 $10,000 Implemented
LE0197 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,606 $2,484 Implemented
LE0197 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $864 $840 Implemented
SU0176 # 02 Y:2004 02 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $19,192 $4,348 Implemented
SU0176 # 03 Y:2004 03 2004 USE MAGNETIC TECHNOLOGY TO TREAT WATER $2,160 $939 Implemented
SU0176 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $934 $434 Implemented
LE0175 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,828 $400 Implemented
LE0165 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $8,970 $1,440 Implemented
LE0165 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $468 $0 Implemented
LE0154 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $0 Implemented
LE0154 # 03 Y:2003 03 2003 REPAIR OR REPLACE STEAM TRAPS $3,519 $3,000 Implemented
LE0154 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,485 $750 Implemented
WV0257 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $0 Implemented
WV0257 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,834 $281,530 Implemented