IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

263

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0657 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,150 $16,680 Implemented
AM0643 # 01 Y:2013 01 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $34,060 $250,000 Implemented
AM0643 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,370 $50 Implemented
AM0643 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,940 $235 Implemented
AM0643 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,900 $500 Implemented
AM0643 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,960 $500 Implemented
AM0634 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,630 $12,080 Implemented
AM0634 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,620 $1,000 Implemented
AM0634 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,780 $60 Implemented
AM0634 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $510 $0 Implemented
AM0634 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $297 $1,520 Implemented
AM0627 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,546 $980 Implemented
AM0620 # 06 Y:2012 06 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,965 $240 Implemented
AM0620 # 08 Y:2012 08 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,390 $0 Implemented
AM0620 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,270 $3,290 Implemented
AM0620 # 10 Y:2012 10 2012 INSULATE BARE EQUIPMENT $1,030 $1,650 Implemented
AM0620 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,660 $120 Implemented
AM0620 # 04 Y:2012 04 2012 REPLACE BOILER $5,730 $30,000 Implemented
AM0620 # 02 Y:2012 02 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,800 $0 Implemented
AM0620 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,900 $2,000 Implemented
AM0612 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $200 $0 Implemented
AM0612 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,520 $280 Implemented
AM0565 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,070 $350 Implemented
AM0565 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $766 $381 Implemented
AM0565 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,160 $18 Implemented