IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0653 # 05 Y:2014 05 2014 USE RADIANT HEATER FOR SPOT HEATING $9,860 $7,200 Not Implemented
AM0653 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,015 $2,000 Implemented
AM0653 # 07 Y:2014 07 2014 KEEP LAMPS AND REFLECTORS CLEAN $5,940 $1,305 Not Implemented
AM0653 # 08 Y:2014 08 2014 USE RADIANT HEATER FOR SPOT HEATING $1,090 $1,160 Implemented
AM0653 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,090 $47,700 Implemented
AM0653 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,460 $26 Implemented
UU0113 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,620 $180 Not Implemented
UU0113 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $173,190 $46,250 Not Implemented
UU0113 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,530 $20,000 Not Implemented
UU0113 # 04 Y:2006 04 2006 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $87,860 $500,000 Not Implemented
UU0102 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,990 $78,390 Not Implemented
UU0102 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $23,250 $8,290 Implemented
UU0102 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $540 $620 Not Implemented
UU0102 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $4,040 Implemented
UU0102 # 01 Y:2006 01 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $88,420 $3,500 Implemented
UU0087 # 05 Y:2005 05 2005 OPTIMIZE PLANT POWER FACTOR $470 $2,900 Not Implemented
UU0087 # 01 Y:2005 01 2005 $84,030 $200,000 Not Implemented
UU0087 # 02 Y:2005 02 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,270 $0 Not Implemented
UU0087 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,180 $3,040 Not Implemented
UU0087 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,680 $240 Not Implemented
UU0042 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $15,620 $8,000 Not Implemented
UU0042 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,027 $1,500 Not Implemented
UU0042 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $632 $550 Not Implemented
UU0042 # 04 Y:2003 04 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,960 $0 Not Implemented
UU0042 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,836 $20,051 Not Implemented