IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,698

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0711 # 01 Y:2018 01 2018 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $1,082,323 $800,001 Not Implemented
OR0711 # 02 Y:2018 02 2018 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $68,286 $68,224 Not Implemented
OR0711 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,749 $10,303 Not Implemented
OR0711 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,277 $1,904 Not Implemented
OR0711 # 05 Y:2018 05 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,097 $30,240 Not Implemented
OR0702 # 01 Y:2018 01 2018 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $20,800 $7,140 Not Implemented
OR0702 # 02 Y:2018 02 2018 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,088 $660 Not Implemented
OR0702 # 03 Y:2018 03 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,409 $1,005 Not Implemented
OR0702 # 04 Y:2018 04 2018 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,065 $5,807 Not Implemented
OR0701 # 01 Y:2018 01 2018 INSTALL SYSTEM TO COLLECT SCRAP $35,903 $29,900 Not Implemented
OR0701 # 02 Y:2018 02 2018 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $17,929 $8,549 Not Implemented
OR0701 # 03 Y:2018 03 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,954 $11,773 Not Implemented
OR0701 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,441 $4,175 Not Implemented
BS0107 # 01 Y:2017 01 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $4,338 $5,117 Not Implemented
BS0107 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,846 $2,224 Not Implemented
BS0107 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,395 $2,640 Not Implemented
BS0107 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $54,676 $1,500 Not Implemented
BS0107 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,021 $32,160 Not Implemented
OR0693 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,809 $500 Not Implemented
OR0693 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $5,614 $2,800 Not Implemented
OR0693 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,216 $28,216 Not Implemented
OR0693 # 04 Y:2017 04 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $45,260 $144,180 Not Implemented
OR0691 # 01 Y:2017 01 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $220,769 $39,442 Not Implemented
OR0691 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,762 $1,200 Implemented
OR0691 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $772 $4,048 Not Implemented