IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0615 # 05 Y:2013 05 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,352 $36,600 Not Implemented
OR0614 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $667 $446 Not Implemented
OR0614 # 03 Y:2013 03 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,327 $0 Implemented
OR0614 # 04 Y:2013 04 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,554 $1,828 Not Implemented
OR0614 # 01 Y:2013 01 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $31,637 $42,000 Not Implemented
OR0614 # 02 Y:2013 02 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,101 $10,000 Implemented
OR0612 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $7,387 $13,420 Implemented
OR0612 # 04 Y:2013 04 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,981 $4,470 Not Implemented
OR0613 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,262 $36,000 Implemented
OR0613 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,364 $17,632 Not Implemented
OR0613 # 06 Y:2013 06 2013 INSTALL TIMERS AND/OR THERMOSTATS $991 $95 Implemented
OR0613 # 04 Y:2013 04 2013 RECOVER AND REUSE WASTE MATERIAL $3,635 $8,000 Not Implemented
OR0613 # 01 Y:2013 01 2013 REUSE / RECYCLE/ SELL PAPER PRODUCTS $11,140 $5,000 Implemented
OR0613 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $3,040 $2,913 Not Implemented
OR0612 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,043 $922 Implemented
OR0613 # 07 Y:2013 07 2013 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $706 $448 Implemented
OR0612 # 01 Y:2013 01 2013 UPGRADE CONTROLS ON COMPRESSORS $30,841 $79,939 Not Implemented
OR0612 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,184 $10,125 Implemented
BS0020 # 06 Y:2013 06 2013 COVER OPEN TANKS $3,845 $6,050 Not Implemented
BS0020 # 01 Y:2013 01 2013 REDESIGN PROCESS $15,024 $15,359 Not Implemented
BS0020 # 02 Y:2013 02 2013 OPTIMIZE PLANT POWER FACTOR $18,318 $19,262 Implemented
BS0020 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,893 $71,307 Implemented
BS0020 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,831 $15,600 Implemented
BS0020 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $9,887 $5,300 Implemented
OR0611 # 04 Y:2013 04 2013 UPGRADE OBSOLETE EQUIPMENT $5,340 $11,938 Not Implemented