IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0497 # 06 Y:2015 06 2015 DEVELOP A REPAIR/REPLACE POLICY $2,304 $567 Implemented
WV0497 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $9,773 $3,008 Implemented
WV0497 # 05 Y:2015 05 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,086 $1,000 Implemented
WV0497 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,054 $4,016 Implemented
WV0474 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,986 $15,864 Implemented
WV0474 # 03 Y:2013 03 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,698 $1,000 Implemented
WV0474 # 05 Y:2013 05 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,920 $72 Implemented
WV0474 # 06 Y:2013 06 2013 DEVELOP A REPAIR/REPLACE POLICY $1,715 $392 Implemented
WV0474 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,586 $324 Implemented
WV0474 # 10 Y:2013 10 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $407 $500 Implemented
WV0451 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,062 $5,773 Implemented
WV0451 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,858 $380 Implemented
WV0451 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $3,732 $1,737 Implemented
WV0451 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,273 $10,200 Implemented
WV0451 # 13 Y:2012 13 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,600 $2,500 Implemented
WV0451 # 16 Y:2012 16 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $783 $70 Implemented
WV0420 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $4,500 $4,500 Implemented
WV0420 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $764 $480 Implemented
WV0420 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,569 $14,510 Implemented
WV0394 # 13 Y:2009 13 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $998 $0 Implemented
WV0394 # 11 Y:2009 11 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,448 $619 Implemented
WV0394 # 09 Y:2009 09 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,940 $1,000 Implemented
WV0394 # 08 Y:2009 08 2009 DEVELOP A REPAIR/REPLACE POLICY $3,395 $678 Implemented
WV0394 # 06 Y:2009 06 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,269 $600 Implemented
WV0394 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,978 $19,253 Implemented