IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0333 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,663 $195 Implemented
WV0333 # 03 Y:2006 03 2006 DEVELOP A REPAIR/REPLACE POLICY $2,692 $544 Implemented
WV0333 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,819 $800 Implemented
WV0303 # 02 Y:2004 02 2004 DEVELOP A REPAIR/REPLACE POLICY $8,151 $458 Implemented
WV0303 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,576 $8,537 Implemented
WV0303 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,414 $618 Implemented
WV0303 # 07 Y:2004 07 2004 USE SYNTHETIC LUBRICANT $1,981 $560 Implemented
WV0303 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,770 $236 Implemented
WV0303 # 10 Y:2004 10 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,061 $414 Implemented
WV0303 # 11 Y:2004 11 2004 RECOVER WASTE HEAT FROM EQUIPMENT $816 $515 Implemented
WV0303 # 13 Y:2004 13 2004 INSULATE BARE EQUIPMENT $171 $303 Implemented
WV0281 # 03 Y:2003 03 2003 DEVELOP A REPAIR/REPLACE POLICY $1,940 $240 Implemented
WV0281 # 04 Y:2003 04 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,652 $1,000 Implemented
WV0281 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $1,163 $38 Implemented
WV0274 # 02 Y:2003 02 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,198 $1,000 Implemented
WV0274 # 03 Y:2003 03 2003 MAINTAIN MACHINES TO REDUCE LEAKS $5,774 $35 Implemented
WV0274 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $3,173 $252 Implemented
WV0274 # 06 Y:2003 06 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,068 $435 Implemented
WV0274 # 07 Y:2003 07 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $772 $2,925 Implemented
WV0274 # 08 Y:2003 08 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $654 $73 Implemented
WV0274 # 09 Y:2003 09 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $26 $0 Implemented
WV0267 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $582 $150 Implemented
WV0267 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,402 $30 Implemented
WV0267 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,185 $135 Implemented
WV0267 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $353 $395 Implemented