IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,938

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0208 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $792 $100 Implemented
NC0208 # 04 Y:2001 04 2001 USE PHOTOCELL CONTROLS $113 $200 Implemented
NC0208 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $151 $2,700 Implemented
NC0208 # 07 Y:2001 07 2001 $22,836 $6,500 Implemented
AS0294 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,366 $6,076 Implemented
AS0294 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,268 $2,070 Implemented
AS0294 # 03 Y:2001 03 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,492 $15,000 Implemented
MS0198 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $502 $161 Implemented
MS0198 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $2,123 $120 Implemented
MS0198 # 01 Y:2001 01 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $51,081 $50,126 Implemented
MS0195 # 05 Y:2001 05 2001 INSTALL TIMERS AND/OR THERMOSTATS $74 $119 Implemented
MS0195 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,494 $1,000 Implemented
TA0019 # 04 Y:2001 04 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $5,184 $5,331 Implemented
TA0019 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $1,015 $346 Implemented
TA0019 # 02 Y:2001 02 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,836 $225 Implemented
OK0631 # 03 Y:2001 03 2001 ADD AREA LIGHTING SWITCHES $1,991 $194 Implemented
OK0631 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,487 $400 Implemented
OK0631 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,478 $6,067 Implemented
OK0631 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $13,831 $8,000 Implemented
OK0631 # 05 Y:2001 05 2001 $174,720 $364,000 Implemented
OK0625 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,851 $84 Implemented
OK0625 # 06 Y:2001 06 2001 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $39,782 $95,000 Implemented
OK0625 # 05 Y:2001 05 2001 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $868 $230 Implemented
OK0625 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $376 $476 Implemented
OK0625 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,900 $360 Implemented