Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
69
matching recommendationsNAICS | 221 | Utilities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0784 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $4,041 | $12,113 | Implemented |
UF0604 # 03 Y:2023 | 03 | 2023 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $8,590 | $37,275 | Implemented |
UF0604 # 02 Y:2023 | 02 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $30,577 | $37,582 | Implemented |
UF0604 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,173 | $0 | Implemented |
UF0604 # 05 Y:2023 | 05 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,430 | $780 | Implemented |
UF0604 # 07 Y:2023 | 07 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $63,559 | $10,000 | Implemented |
UF0604 # 08 Y:2023 | 08 | 2023 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $10,959 | $0 | Implemented |
MUWT04 # 07 Y:2023 | 07 | 2023 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $85,324 | $0 | Implemented |
MUWT04 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $64 | $0 | Implemented |
AM0889 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $170 | $47 | Implemented |
AM0889 # 02 Y:2023 | 02 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,570 | $4,570 | Implemented |
AM0889 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,140 | $1,550 | Implemented |
AS0561 # 07 Y:2023 | 07 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,930 | $304 | Implemented |
OK1097 # 03 Y:2023 | 03 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $310 | $291 | Implemented |
NL0083 # 07 Y:2023 | 07 | 2023 | IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION | $200 | $2,040 | Implemented |
NL0083 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $854 | $2,700 | Implemented |
NL0083 # 02 Y:2023 | 02 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $18,134 | $8,660 | Implemented |
NL0083 # 01 Y:2023 | 01 | 2023 | METER WASTE WATER | $31,255 | $151,280 | Implemented |
NL0083 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,182 | $4,945 | Implemented |
MZ0344 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $1,547 | $1,000 | Implemented |
MZ0344 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $61,110 | $32,240 | Implemented |
MZ0344 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $59,175 | $0 | Implemented |
MZ0344 # 01 Y:2023 | 01 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,614 | $750 | Implemented |
SF0602 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,247 | $30,019 | Implemented |
OK1090 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,602 | $1,797 | Implemented |