Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 221310 | Water Supply and Irrigation Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0508 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $389 | $529 | Implemented |
AS0508 # 02 Y:2021 | 02 | 2021 | ELIMINATE/REDUCE AN OPERATION | $20,000 | $200 | Implemented |
AS0508 # 03 Y:2021 | 03 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,773 | $1,500 | Implemented |
AS0508 # 04 Y:2021 | 04 | 2021 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $427 | $114 | Implemented |
AS0504 # 02 Y:2021 | 02 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,984 | $2,000 | Implemented |
AS0504 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,467 | $4,029 | Implemented |
AS0504 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $2,778 | $3,974 | Implemented |
AS0504 # 06 Y:2021 | 06 | 2021 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $1,029 | $245 | Implemented |
AS0503 # 01 Y:2021 | 01 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $316,547 | $4,413,360 | Implemented |
AS0503 # 03 Y:2021 | 03 | 2021 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $35,467 | $918 | Implemented |
AS0503 # 04 Y:2021 | 04 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $27,634 | $115 | Implemented |
AS0503 # 05 Y:2021 | 05 | 2021 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $25,372 | $918 | Implemented |
AS0503 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,834 | $5,555 | Implemented |
AS0503 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $9,147 | $2,290 | Implemented |
AS0503 # 08 Y:2021 | 08 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,438 | $14,828 | Implemented |
AS0481 # 06 Y:2020 | 06 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $706 | $912 | Implemented |
AS0481 # 01 Y:2020 | 01 | 2020 | USE POWER DURING OFF-PEAK PERIODS | $7,396 | $298 | Implemented |
SF0452 # 01 Y:2014 | 01 | 2014 | IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM | $13,134 | $1,372 | Implemented |
SF0452 # 02 Y:2014 | 02 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,312 | $552 | Implemented |
SF0452 # 04 Y:2014 | 04 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,986 | $6,681 | Implemented |
SF0452 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $536 | $2,722 | Implemented |
SD0451 # 01 Y:2012 | 01 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $35,395 | $14,332 | Implemented |
SD0451 # 03 Y:2012 | 03 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,577 | $2,373 | Implemented |
SD0448 # 02 Y:2012 | 02 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $10,195 | $3,320 | Implemented |
SD0448 # 03 Y:2012 | 03 | 2012 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $122,834 | $75,600 | Implemented |