IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 221310 Water Supply and Irrigation Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0508 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $389 $529 Implemented
AS0508 # 02 Y:2021 02 2021 ELIMINATE/REDUCE AN OPERATION $20,000 $200 Implemented
AS0508 # 03 Y:2021 03 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,773 $1,500 Implemented
AS0508 # 04 Y:2021 04 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $427 $114 Implemented
AS0504 # 02 Y:2021 02 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,984 $2,000 Implemented
AS0504 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,467 $4,029 Implemented
AS0504 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $2,778 $3,974 Implemented
AS0504 # 06 Y:2021 06 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $1,029 $245 Implemented
AS0503 # 01 Y:2021 01 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $316,547 $4,413,360 Implemented
AS0503 # 03 Y:2021 03 2021 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,467 $918 Implemented
AS0503 # 04 Y:2021 04 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $27,634 $115 Implemented
AS0503 # 05 Y:2021 05 2021 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $25,372 $918 Implemented
AS0503 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,834 $5,555 Implemented
AS0503 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $9,147 $2,290 Implemented
AS0503 # 08 Y:2021 08 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,438 $14,828 Implemented
AS0481 # 06 Y:2020 06 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $706 $912 Implemented
AS0481 # 01 Y:2020 01 2020 USE POWER DURING OFF-PEAK PERIODS $7,396 $298 Implemented
SF0452 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $536 $2,722 Implemented
SF0452 # 01 Y:2014 01 2014 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $13,134 $1,372 Implemented
SF0452 # 02 Y:2014 02 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,312 $552 Implemented
SF0452 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,986 $6,681 Implemented
SD0451 # 01 Y:2012 01 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $35,395 $14,332 Implemented
SD0451 # 03 Y:2012 03 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,577 $2,373 Implemented
SD0448 # 02 Y:2012 02 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $10,195 $3,320 Implemented
SD0448 # 03 Y:2012 03 2012 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $122,834 $75,600 Implemented