IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,603

matching recommendations
Reset
NAICS 22132 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0415 # 07 Y:2012 07 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,835 $60,972 Implemented
SF0415 # 08 Y:2012 08 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,277 $149,347 Implemented
SF0415 # 09 Y:2012 09 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $95,167 $0 Implemented
SF0414 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $6,448 $0 Not Implemented
SF0414 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $923 $0 Implemented
SF0414 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $0 Implemented
SF0414 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,223 $382 Not Implemented
SF0414 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,314 $38,630 Not Implemented
SF0414 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $85,494 $200,504 Not Implemented
SF0414 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $39,049 $165,422 Not Implemented
SF0414 # 08 Y:2012 08 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,081 $36,975 Not Implemented
SF0414 # 09 Y:2012 09 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $129,890 $2,875,288 Implemented
SF0410 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $86,008 $156,543 Implemented
SF0410 # 09 Y:2012 09 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $178,304 $353,108 Implemented
SF0410 # 10 Y:2012 10 2012 INSTALL OCCUPANCY SENSORS $24,022 $71,940 Implemented
SF0410 # 01 Y:2012 01 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $33,835 $0 Implemented
SF0410 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,290 $129 Implemented
SF0410 # 03 Y:2012 03 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,966 $1,452 Implemented
SF0410 # 04 Y:2012 04 2012 REDUCE FLUID FLOW RATES $20,646 $4,715 Implemented
SF0410 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $156,563 $70,219 Implemented
SF0410 # 06 Y:2012 06 2012 REDUCE FLUID FLOW RATES $41,557 $33,080 Implemented
SF0410 # 07 Y:2012 07 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $121,698 $165,923 Implemented
SF0409 # 01 Y:2012 01 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $382,102 $32,168 Implemented
SF0409 # 02 Y:2012 02 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $53,342 $534 Implemented
SF0409 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,006 $307 Implemented