IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0766 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,063 $0 Implemented
OK0766 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $1,937 Implemented
UF0414 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,527 $7,379 Implemented
UF0414 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $44,500 $13,000 Implemented
UF0414 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,808 $15,562 Implemented
UF0414 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $255 $39 Implemented
UF0414 # 06 Y:2008 06 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,447 $371 Implemented
SF0361 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $6,816 $0 Implemented
SF0361 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $701 $0 Implemented
SF0361 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $237 $162 Implemented
SF0361 # 04 Y:2008 04 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,199 $713 Implemented
SF0361 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $1,614 $1,036 Implemented
SF0361 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,413 $4,592 Implemented
MS0330 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,490 $1,800 Implemented
MS0330 # 02 Y:2008 02 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,879 $1,000 Implemented
MS0330 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,253 $401 Implemented
MS0330 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,975 $17,657 Implemented
MS0330 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,629 $8,225 Implemented
SF0360 # 01 Y:2008 01 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $103 $0 Implemented
SF0360 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,717 $10,269 Implemented
LL0298 # 02 Y:2008 02 2008 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,587 $152 Implemented
LL0298 # 03 Y:2008 03 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,972 $240 Implemented
LL0295 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,016 $760 Implemented
LL0295 # 08 Y:2008 08 2008 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $265 $152 Implemented
UF0412 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,683 $42,414 Implemented