IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0225 # 09 Y:2012 09 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,598 $80 Implemented
MI0225 # 10 Y:2012 10 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,046 $255 Implemented
LE0339 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,612 $13,428 Implemented
LE0339 # 05 Y:2012 05 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,198 $9,800 Implemented
LE0339 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,280 $1,000 Implemented
LE0339 # 10 Y:2012 10 2012 REPAIR OR REPLACE STEAM TRAPS $13,433 $0 Implemented
OR0583 # 01 Y:2012 01 2012 AVOID FROST FORMATION ON EVAPORATORS $3,140 $2,412 Implemented
OR0583 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,663 $19,592 Implemented
OR0583 # 04 Y:2012 04 2012 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $6,078 $500 Implemented
OR0583 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,391 $3,854 Implemented
OR0583 # 06 Y:2012 06 2012 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,779 $6,600 Implemented
NC0448 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $2,746 $5,600 Implemented
NC0448 # 04 Y:2012 04 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,740 $400 Implemented
NC0448 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $880 $200 Implemented
UA0081 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $1,632 $1,609 Implemented
UA0081 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,459 $480 Implemented
UA0081 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,206 $5,100 Implemented
UA0081 # 06 Y:2012 06 2012 INSTALL TIMERS AND/OR THERMOSTATS $2,481 $2,210 Implemented
AM0612 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,520 $280 Implemented
AM0612 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $200 $0 Implemented
WV0446 # 15 Y:2012 15 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,151 $70 Implemented
WV0446 # 04 Y:2012 04 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $16,273 $1,000 Implemented
WV0446 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,963 $2,500 Implemented
WV0446 # 09 Y:2012 09 2012 DEVELOP A REPAIR/REPLACE POLICY $6,712 $5,683 Implemented
WV0446 # 11 Y:2012 11 2012 REPAIR OR REPLACE STEAM TRAPS $3,610 $4,438 Implemented