Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 31141 | Frozen Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0780 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,517 | $2,000 | Implemented |
OR0773 # 01 Y:2023 | 01 | 2023 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $5,439 | $1,278 | Implemented |
OR0773 # 02 Y:2023 | 02 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,051 | $797 | Implemented |
OR0610 # 05 Y:2013 | 05 | 2013 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $64,511 | $85,275 | Implemented |
OR0609 # 07 Y:2013 | 07 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $117,782 | $160,770 | Implemented |
OR0565 # 03 Y:2011 | 03 | 2011 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $10,300 | $17,700 | Implemented |
OR0565 # 06 Y:2011 | 06 | 2011 | HEAT WATER WITH EXHAUST HEAT | $77,370 | $96,750 | Implemented |
OR0565 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,900 | $10,900 | Implemented |
OR0565 # 02 Y:2011 | 02 | 2011 | INSULATE BARE EQUIPMENT | $6,110 | $21,715 | Implemented |
OR0565 # 01 Y:2011 | 01 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $14,900 | $9,340 | Implemented |
OR0561 # 02 Y:2010 | 02 | 2010 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $84,544 | $24,245 | Implemented |
OR0561 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,321 | $3,321 | Implemented |
OR0561 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,786 | $10,046 | Implemented |
OR0561 # 05 Y:2010 | 05 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $90,831 | $106,316 | Implemented |
OR0561 # 04 Y:2010 | 04 | 2010 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $18,820 | $19,635 | Implemented |
OR0561 # 03 Y:2010 | 03 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $14,426 | $7,234 | Implemented |
OR0561 # 01 Y:2010 | 01 | 2010 | ISOLATE HOT OR COLD EQUIPMENT | $7,124 | $1,529 | Implemented |
OR0558 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $14,738 | $120,911 | Implemented |
OR0558 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,319 | $4,935 | Implemented |
OR0558 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,102 | $7,102 | Implemented |
OR0558 # 01 Y:2010 | 01 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,602 | $2,965 | Implemented |
OR0459 # 02 Y:2004 | 02 | 2004 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,750 | $300 | Implemented |
OR0459 # 03 Y:2004 | 03 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $4,820 | $36,600 | Implemented |
OR0459 # 06 Y:2004 | 06 | 2004 | OPTIMIZE PLANT POWER FACTOR | $2,730 | $5,130 | Implemented |
OR0459 # 05 Y:2004 | 05 | 2004 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $5,330 | $2,825 | Implemented |