IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
NAICS 311615 Poultry Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0884 # 08 Y:2014 08 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,563 $280 Implemented
AM0657 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,150 $16,680 Implemented
AM0657 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,540 $0 Implemented
AM0657 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,365 $330 Implemented
OK0833 # 01 Y:2012 01 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,700 $5,000 Implemented
OK0833 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,000 $500 Implemented
OK0833 # 08 Y:2012 08 2012 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $31,700 $0 Implemented
OK0833 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $3,400 Implemented
UA0081 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $1,632 $1,609 Implemented
UA0081 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,459 $480 Implemented
UA0081 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,206 $5,100 Implemented
UA0081 # 06 Y:2012 06 2012 INSTALL TIMERS AND/OR THERMOSTATS $2,481 $2,210 Implemented
DL0081 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,870 $24,400 Implemented
DL0081 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,801 $36,000 Implemented
DL0081 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,818 $54,000 Implemented
DL0081 # 10 Y:2012 10 2012 REDUCE VENTILATION AIR $26,354 $4,500 Implemented
DL0072 # 08 Y:2011 08 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,150 $13,000 Implemented
DL0072 # 09 Y:2011 09 2011 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $24,840 $2,500 Implemented
DL0072 # 12 Y:2011 12 2011 REDUCE VENTILATION AIR $44,740 $4,400 Implemented
DL0072 # 13 Y:2011 13 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,200 $6,125 Implemented
OK0789 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,970 $31,888 Implemented
OK0789 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,798 $7,980 Implemented
OK0789 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $827 $896 Implemented
OK0789 # 11 Y:2010 11 2010 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $997 $1,486 Implemented
GT0827 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,421 $4,053 Implemented